No. | Item |
---|---|
1. |
Enterprise Close Industrial Estate, Factory Lane, Croydon, CR0 3RZ - Asset Disposal Decision maker: Corporate Director of Resources (Section 151) Decision due: 13 Feb 2024 Lead officer: Robert Lines Notice of proposed decision first published: 05/02/2024 Reason for urgency: Anticipated restriction: Part exempt - view reasons |
2. |
Davis House, 69-73 High Street, Croydon, CR0 1QE Decision maker: Corporate Director of Resources (Section 151) Decision due: Not before 29th Feb 2024 Lead officer: Robert Lines Notice of proposed decision first published: 21/02/2024 This decision will be taken under urgency procedures. Reason for urgency: Anticipated restriction: Part exempt - view reasons |
3. |
Regina Road Estate Regeneration - Progress Update Decision maker: Cabinet Decision due: 15 May 2024 Originally due: 27 Mar 2024 Lead officer: Robin Smith Notice of proposed decision first published: 21/12/2023 Anticipated restriction: Open - |
4. |
Extension and variation of Public Health Primary Care Contracts Decision maker: Executive Mayor Decision due: Not before 18th May 2023 Lead officer: Donna Cudmore Notice of proposed decision first published: 18/04/2023 Anticipated restriction: Open - |
5. |
Award of Contract for the Fire Risk Assessment Consultancy Services Decision maker: Executive Mayor Decision due: Not before 18th May 2023 Lead officer: Sam Pullen Notice of proposed decision first published: 18/04/2023 Anticipated restriction: Open - |
6. |
Procurement of Housing Professional Consultancy Services Decision maker: Executive Mayor Decision due: Not before 18th May 2023 Lead officer: Hannah Ojo Notice of proposed decision first published: 18/04/2023 Anticipated restriction: Open - |
7. |
Decision maker: Executive Mayor Decision due: Not before 17th Jun 2023 Lead officer: Annamika Koomoshan Notice of proposed decision first published: 17/05/2023 Anticipated restriction: Open - |
8. |
Passenger Transport DPS Extension Decision maker: Executive Mayor Decision due: Not before 3rd Aug 2023 Lead officer: Jackie Wright Notice of proposed decision first published: 06/07/2023 Anticipated restriction: Open - |
9. |
Passenger Transport Minibus Contract - Ad Hoc Mini-Bus Routes -Procurement Strategy Report Decision maker: Cabinet Member for Homes Decision due: Not before 8th Apr 2023 Lead officer: Daniel Shepherd Notice of proposed decision first published: 08/03/2023 Anticipated restriction: Open - |
10. |
Street Outreach and Resettlement Service -Procurement Strategy Decision maker: Cabinet Member for Homes Decision due: Not before 8th Apr 2023 Lead officer: Beatrice Cingtho-Taylor Notice of proposed decision first published: 08/03/2023 Anticipated restriction: Open - |
11. |
Award of Contract for the Lift Maintenance and Refurbishment Services Ltd. Decision maker: Cabinet Member for Homes Decision due: Not before 21st Aug 2023 Lead officer: Niall O’Rourke Notice of proposed decision first published: 21/07/2023 Anticipated restriction: Open - |
12. |
CCTV Supply, Installation & Maintenance Decision maker: Cabinet Member for Community Safety Decision due: Not before 25th May 2023 Lead officer: Christopher Rowney Notice of proposed decision first published: 26/04/2023 Anticipated restriction: Open - |
13. |
Joint Children's Speech and Language Therapy and Occupational Therapy Decision maker: Cabinet Member for Children and Young People Decision due: Not before 13th Oct 2023 Lead officer: Chris Bush Notice of proposed decision first published: 14/09/2023 Anticipated restriction: Open - |
14. |
Decision maker: Cabinet Member for Health and Adult Social Care Decision due: Not before 29th Mar 2024 Notice of proposed decision first published: 01/03/2024 Anticipated restriction: Part exempt - view reasons Explanation of anticipated restriction: |
15. |
ICT End User Services Contract Direct Award Decision maker: Interim Assistant Chief Executive Officer Decision due: Not before 8th Jan 2024 Lead officer: Fahid Ahmad Notice of proposed decision first published: 11/12/2023 Anticipated restriction: Open - |
16. |
Decision maker: Corporate Director of Housing Decision due: Not before 28th Jun 2023 Lead officer: Kevin Hartshorn Notice of proposed decision first published: 31/05/2023 Anticipated restriction: Part exempt - view reasons |
17. |
Extension of the Electrical and Mechanical Contract Decision maker: Corporate Director of Housing Decision due: Not before 10th Aug 2023 Lead officer: Niall O’Rourke Notice of proposed decision first published: 12/07/2023 Anticipated restriction: Open - |
18. |
Extension of Contract for the Echelon Partnering Services Decision maker: Corporate Director of Housing Decision due: Not before 10th Aug 2023 Lead officer: Kevin Hartshorn Notice of proposed decision first published: 12/07/2023 Anticipated restriction: Open - |
19. |
Single Homeless Accommodation and Support Decision maker: Corporate Director of Housing Decision due: Not before 29th Feb 2024 Notice of proposed decision first published: 31/01/2024 Anticipated restriction: Open - |
20. |
Regina Road Professional Service - Employers Agent / Programme Monitor Decision maker: Corporate Director of Housing Decision due: Not before 9th Mar 2024 Lead officer: Robin Smith Notice of proposed decision first published: 09/02/2024 Anticipated restriction: Part exempt - view reasons |
21. |
PMI General Building Works Contract Extension Decision maker: Corporate Director of Housing Decision due: Not before 27th Mar 2024 Lead officer: Kevin Hartshorn Notice of proposed decision first published: 11/12/2023 Anticipated restriction: Part exempt - view reasons |
22. |
Contract Award for Healthwatch Croydon Service Decision maker: Corporate Director of Adult Social Care & Health Decision due: Not before 27th Feb 2023 Lead officer: Karen Handy Notice of proposed decision first published: 27/01/2023 Anticipated restriction: Part exempt - view reasons |
23. |
Older People Care and Support Provision - Extension Decision maker: Corporate Director of Adult Social Care & Health Decision due: Not before 3rd May 2023 Lead officer: Ami Patel Notice of proposed decision first published: 03/04/2023 Anticipated restriction: Open - |
24. |
Decision maker: Corporate Director of Adult Social Care & Health Decision due: Not before 8th Nov 2023 Lead officer: Paul Kouassi Notice of proposed decision first published: 07/10/2023 Anticipated restriction: Open - |
25. |
Extension and Variation of Asset Based Floating Support Contract for People with Mental Health Needs Decision maker: Corporate Director of Adult Social Care & Health Decision due: Not before 28th Dec 2023 Lead officer: Shirley Moyes Notice of proposed decision first published: 29/11/2023 Anticipated restriction: Open - |
26. |
Request for approval to Dispose of Lion Green Road Development Decision maker: Corporate Director of Resources (Section 151) Decision due: Not before 26th Apr 2023 Lead officer: Nish Popat Notice of proposed decision first published: 18/04/2023 This decision will be taken under urgency procedures. Reason for urgency: Anticipated restriction: Part exempt - view reasons |
27. |
Training Service Provider - employees Decision maker: Corporate Director of Resources (Section 151) Decision due: Not before 18th Oct 2023 Lead officer: Grace Addy Notice of proposed decision first published: 19/09/2023 Anticipated restriction: Part exempt - view reasons |
28. |
Public Health Nursing – Extension and variation of the Section 75 Agreement Decision maker: Corporate Director of Resources (Section 151) Decision due: Not before 17th Jan 2024 Lead officer: Christine Williams Notice of proposed decision first published: 19/12/2023 Anticipated restriction: Open - |
29. |
Best Start Extension and Variation Report Decision maker: Corporate Director of Children, Young People & Education Decision due: Not before 18th Feb 2024 Notice of proposed decision first published: 18/01/2024 Anticipated restriction: Open - |
30. |
Arboricultural Services and Maintenance (Trees and Woodlands) Decision maker: Corporate Director of Sustainable Communities, Regeneration & Economic Recovery Decision due: Not before 25th Jun 2023 Lead officer: Paul Dalton Notice of proposed decision first published: 25/05/2023 Anticipated restriction: Part exempt - view reasons |
31. |
Grounds Maintenance - Vehicle and Plant Procurement Decision maker: Corporate Director of Sustainable Communities, Regeneration & Economic Recovery Decision due: Not before 7th Jul 2023 Lead officer: Daniel Shepherd Notice of proposed decision first published: 09/06/2023 Anticipated restriction: Part exempt - view reasons |
32. |
Decision maker: Cabinet Decision: 25 Sep 2024 Lead officer: Stephanie Wilson Decision status: Recommendations Approved Notice of proposed decision first published: 16/04/2024 Anticipated restriction: Open - |
33. |
Decision maker: Corporate Director of Adult Social Care & Health Decision due: Not before 8th Apr 2024 Lead officer: Shirley Moyes Notice of proposed decision first published: 08/03/2024 Anticipated restriction: Part exempt - view reasons |
34. |
Housing Resident Engagement Strategy 24- 27 Decision maker: Cabinet Member for Homes Decision due: 26 Jun 2024 Lead officer: Mary Larbie Notice of proposed decision first published: 16/05/2024 Anticipated restriction: Open - |
35. |
To procure a coring contractor to continue Croydon's Coring programme. Decision maker: Cabinet Member for Streets and Environment Decision due: Not before 14th Jun 2024 Lead officer: Hilary Dickson Notice of proposed decision first published: 16/05/2024 Anticipated restriction: Part exempt - view reasons Explanation of anticipated restriction: |
36. |
Extra Care Staffing Extension and Variation Decision maker: Executive Mayor Decision due: Not before 12th Jul 2024 Lead officer: Simon Robson Notice of proposed decision first published: 11/06/2024 Anticipated restriction: Part exempt - view reasons Explanation of anticipated restriction: |
37. |
Imperial Way Freehold, Croydon - Asset Disposal Decision maker: Corporate Director of Resources (Section 151) Decision due: 11 Jul 2024 Lead officer: William Salter Notice of proposed decision first published: 11/06/2024 Anticipated restriction: Part exempt - view reasons Explanation of anticipated restriction: |
38. |
37-39 Imperial Way, Croydon - Asset Disposal Decision maker: Corporate Director of Resources (Section 151) Decision due: Not before 10th Jul 2024 Lead officer: William Salter, William Salter Decision status: Recommendations Approved (subject to call-in) Notice of proposed decision first published: 11/06/2024 Anticipated restriction: Part exempt - view reasons Explanation of anticipated restriction: |
39. |
41 Malcolm Road, Croydon - Asset Disposal Decision maker: Corporate Director of Resources (Section 151) Decision due: Not before 25th Jul 2024 Lead officer: Anthony Shayle Notice of proposed decision first published: 26/06/2024 Anticipated restriction: Part exempt - view reasons Explanation of anticipated restriction: |
40. |
Procurement strategy for Supervised Contact Decision maker: Corporate Director of Children, Young People & Education Decision due: Not before 25th Jul 2024 Lead officer: Francesca Gasparro Notice of proposed decision first published: 26/06/2024 Anticipated restriction: Open - |
41. |
Material Recycling Contract -South London Waste Partnership Decision maker: Corporate Director of Sustainable Communities, Regeneration & Economic Recovery Decision due: Not before 25th Jul 2024 Lead officer: Charles Baker Notice of proposed decision first published: 26/06/2024 Anticipated restriction: Part exempt - view reasons Explanation of anticipated restriction: |
42. |
Decision maker: Corporate Director of Housing Decision due: Not before 31st Jul 2024 Lead officer: Leo Fenn Notice of proposed decision first published: 02/07/2024 Anticipated restriction: Part exempt - view reasons Explanation of anticipated restriction: |
43. |
Brick by Brick Croydon Ltd Loan Write Off Decision maker: Corporate Director of Resources (Section 151) Decision due: Not before 31st Jul 2024 Lead officer: Nish Popat Notice of proposed decision first published: 02/07/2024 Anticipated restriction: Part exempt - view reasons Explanation of anticipated restriction: |
44. |
Fire Safety Remedial Works Contract Decision maker: Corporate Director of Housing Decision due: Not before 1st Aug 2024 Lead officer: Paul Coffey Notice of proposed decision first published: 03/07/2024 Anticipated restriction: Open - |
45. |
Carer Services Procurement (Croydon All-age Carers' Support) Decision maker: Executive Mayor Decision: Not before 8th Aug 2024 Lead officer: Claire Fletcher Decision status: Recommendations Approved Notice of proposed decision first published: 10/07/2024 Anticipated restriction: Open - |
46. |
Family Healthy Behaviours Service Variation report Decision maker: Corporate Director of Adult Social Care & Health Decision due: 9 Aug 2024 Lead officer: Sharon Hemley Notice of proposed decision first published: 10/07/2024 Anticipated restriction: Open - |
47. |
Fire Safety Remedial Works Contract Decision maker: Corporate Director of Housing Decision due: Not before 9th Aug 2024 Lead officer: Paul Coffey Notice of proposed decision first published: 10/07/2024 Anticipated restriction: Open - |
48. |
Water Hygiene (Legionella Consultancy Services Contract) Decision maker: Corporate Director of Housing Decision due: Not before 9th Aug 2024 Lead officer: Kindy Bansal-Shah Notice of proposed decision first published: 10/07/2024 |
49. |
Lease of 3 Imperial Way, Wallington, CR0 4RR Decision maker: Corporate Director of Resources (Section 151) Decision: Not before 23rd Aug 2024 Lead officer: James Reiff Decision status: Recommendations Approved Notice of proposed decision first published: 26/07/2024 Anticipated restriction: Part exempt - view reasons Explanation of anticipated restriction: |
50. |
Notice of General Exception- Whitgift Indemnity and Land Transfer Agreement (ILTA) Remedy - Update Decision maker: Cabinet Decision: 25 Sep 2024 Lead officer: Heather Cheesbrough Decision status: Recommendations Approved Notice of proposed decision first published: 27/06/2024 This decision will be taken under urgency procedures. Reason for urgency: Anticipated restriction: Part exempt - view reasons Explanation of anticipated restriction: |
51. |
Decision maker: Executive Mayor Decision due: Not before 8th Jul 2024 Lead officer: Jon Regan Notice of proposed decision first published: 27/06/2024 This decision will be taken under urgency procedures. Reason for urgency: Anticipated restriction: Open - |
52. |
2024-25 Period 2 Financial Performance Report Decision maker: Cabinet Decision: 25 Sep 2024 Lead officer: Allister Bannin Decision status: Recommendations Approved Notice of proposed decision first published: 02/08/2024 Anticipated restriction: Open - |
53. |
2024-25 Period 3 Financial Performance Report Decision maker: Cabinet Decision: 25 Sep 2024 Lead officer: Allister Bannin Decision status: Recommendations Approved Notice of proposed decision first published: 02/08/2024 Anticipated restriction: Open - |
54. |
Local Stop Smoking Services and Support Grant – Specialist Provision Decision maker: Cabinet Member for Health and Adult Social Care Decision: Not before 4th Sep 2024 Lead officer: Carlos Bailey Decision status: Recommendations Approved Notice of proposed decision first published: 06/08/2024 Anticipated restriction: Open - |
55. |
Single Service Provider for Direct Payment Services Decision maker: Cabinet Member for Health and Adult Social Care Decision: Not before 2nd Sep 2024 Lead officer: Yvonne Green Decision status: Recommendations Approved Notice of proposed decision first published: 06/08/2024 Anticipated restriction: Open - |
56. |
Decision maker: Cabinet Member for Children and Young People Decision due: Not before 7th Sep 2024 Lead officer: Alfred Donkor Notice of proposed decision first published: 08/08/2024 Anticipated restriction: Open - |
57. |
Croydon Investment Plan – Unlocking Croydon’s Potential Decision maker: Cabinet Decision: 25 Sep 2024 Lead officer: Carol Squires Decision status: Recommendations Approved Notice of proposed decision first published: 16/08/2024 Anticipated restriction: Open - |
58. |
Minster Green Public Realm Project - Procurement Strategy Decision maker: Corporate Director of Sustainable Communities, Regeneration & Economic Recovery Decision due: Not before 16th Sep 2024 Lead officer: Heather Cheesbrough Notice of proposed decision first published: 16/08/2024 Anticipated restriction: Open - |
59. |
Decision maker: Corporate Director of Sustainable Communities, Regeneration & Economic Recovery Decision due: Not before 16th Sep 2024 Lead officer: Christopher Rowney Notice of proposed decision first published: 16/08/2024 Anticipated restriction: Open - |
60. |
Passenger Transport Minibus Various Routes Lot 3 Decision maker: Corporate Director of Sustainable Communities, Regeneration & Economic Recovery Decision due: Not before 16th Sep 2024 Lead officer: Daniel Shepherd Notice of proposed decision first published: 16/08/2024 Anticipated restriction: Part exempt - |
61. |
Decision maker: Cabinet Decision: 16 Oct 2024 Decision status: Recommendations Approved Notice of proposed decision first published: 16/08/2024 Anticipated restriction: Open - |
62. |
Housing Allocation Scheme (Allocation Scheme Consultation) Decision maker: Cabinet Decision: 16 Oct 2024 Lead officer: Beatrice Cingtho-Taylor Decision status: Recommendations Approved Notice of proposed decision first published: 16/08/2024 Anticipated restriction: Open - |
63. |
Waste and Street Cleansing Service - Contract Award Report Decision maker: Cabinet Decision: 25 Sep 2024 Lead officer: Charles Baker Decision status: Recommendations Approved Notice of proposed decision first published: 22/08/2024 Anticipated restriction: Part exempt - view reasons Explanation of anticipated restriction: |
64. |
Childcare expansion capital grant funding Wraparound Childcare Programme Funding Decision maker: Executive Mayor Decision: Not before 29th Aug 2024 Lead officer: Shelley Davies Decision status: Recommendations Approved Notice of proposed decision first published: 20/08/2024 This decision will be taken under urgency procedures. Reason for urgency: Anticipated restriction: Open - |
65. |
Decision maker: Corporate Director of Housing Decision: Not before 30th Sep 2024 Lead officer: Kelly Harris Decision status: Recommendations Approved Notice of proposed decision first published: 30/08/2024 Anticipated restriction: Part exempt - view reasons Explanation of anticipated restriction: |
66. |
Housing Options and Newbuild Framework Decision maker: Cabinet Decision due: 20 Nov 2024 Lead officer: Dave Baptiste Notice of proposed decision first published: 30/08/2024 Anticipated restriction: Open - |
67. |
Decision maker: Cabinet Decision due: 20 Nov 2024 Lead officer: Huw Rhys-Lewis Notice of proposed decision first published: 30/08/2024 Anticipated restriction: Part exempt - view reasons Explanation of anticipated restriction: |
68. |
2024-25 Period 4 Financial Performance Report Decision maker: Cabinet Decision: 16 Oct 2024 Lead officer: Allister Bannin Decision status: Recommendations Approved Notice of proposed decision first published: 06/09/2024 Anticipated restriction: Open - |
69. |
Accommodation and Support for Care Experienced Young People Decision maker: Cabinet Decision: 16 Oct 2024 Lead officer: Nish Popat Decision status: Recommendations Approved Notice of proposed decision first published: 17/09/2024 Anticipated restriction: Part exempt - view reasons |
70. |
2025-29 Medium Term Financial Strategy Update Decision maker: Cabinet Decision: 16 Oct 2024 Lead officer: Allister Bannin Decision status: Recommendations Approved Notice of proposed decision first published: 17/09/2024 Anticipated restriction: Open - |
71. |
Increasing Affordable Housing Supply - Inspired Solutions Decision maker: Executive Mayor Decision due: Not before 20th Oct 2024 Lead officer: Huw Rhys-Lewis Notice of proposed decision first published: 20/09/2024 Anticipated restriction: Part exempt - view reasons |
72. |
Children's Home Procurement Strategy Decision maker: Cabinet Member for Children and Young People Decision due: Not before 28th Oct 2024 Lead officer: David Fry Notice of proposed decision first published: 27/09/2024 Anticipated restriction: Open - |
73. |
Adults & Children's Social Care System Permitted Contract Extension New! Decision maker: Corporate Director of Adult Social Care & Health Decision due: Not before 4th Nov 2024 Lead officer: Fahid Ahmad Notice of proposed decision first published: 04/10/2024 Anticipated restriction: Open - |
74. |
End User Services Contract Award New! Decision maker: Interim Assistant Chief Executive Officer Decision: Not before 4th Nov 2024 Lead officer: Fahid Ahmad Decision status: Recommendations Approved Notice of proposed decision first published: 04/10/2024 Anticipated restriction: Part exempt - view reasons Explanation of anticipated restriction: |
75. |
Decision maker: Cabinet Member for Finance Decision: Not before 4th Nov 2024 Lead officer: Fahid Ahmad Decision status: Recommendations Approved Notice of proposed decision first published: 04/10/2024 Anticipated restriction: Part exempt - view reasons Explanation of anticipated restriction: |
76. |
Growth Zone budget and project programme 2025/26 and forward plan New! Decision maker: Cabinet Decision due: 22 Jan 2025 Lead officer: Emily Webster Notice of proposed decision first published: 04/10/2024 Anticipated restriction: Open - |
77. |
Single Service Provider for Direct Payment Services - Contract Award New! Decision maker: Corporate Director of Adult Social Care & Health Decision due: Not before 11th Nov 2024 Lead officer: Cris Green Notice of proposed decision first published: 11/10/2024 Anticipated restriction: Open - |